The process of obtaining consent for development is seen by some as a barrier to growth. It can be perceived to be slow and over-bureaucratic, with too many different bodies able to prevent or slow down approval.
Following the recommendations of the Killian Pretty Review in 2008, and in line with the government’s aim ‘…to deregulate and remove barriers to economic growth’, Adrian Penfold was asked to identify whether non-planning consents were delaying or discouraging investment. Non-planning consents are those consents other than planning permission that are required for a development to proceed.
Commissioned the Department of Business Innovation and Skills (BIS), Penfold's remit was ‘…to identify opportunities to deregulate, as a means of supporting business investment in development…’.
The Penfold Review, “Review of non-planning consents” was published on July 18th 2010.
[edit] Findings
The review suggested that non-planning consents did cause delay and uncertainty for development proposals, as well as additional costs. Penfold found that whilst non-planning consents performed a useful role in regulating development (for example; protecting endangered species, tackling climate change, delivering the road network and protecting health and well-being), ‘…the complexity of the non-planning consents landscape and its interaction with the planning system impose additional costs and generate additional risk for businesses. Together, they are a sizeable factor in determining the investment climate in the UK and, therefore, in delivering sustainable development and economic growth’.
In particular, developers highlighted that heritage, highways and environment-related consents were the most problematic.
Penfold found that there was:
- Unnecessary bureaucracy.
- Uncertainty about the time that approvals are likely to take.
- Duplication of roles.
- An absence of a service culture.
- Inconsistency between approving bodies.
- Poor interaction between approving bodies.
- A lack of understanding of the impacts the approval process has on development.
- No standard approval process for developers to follow.
[edit] Recommendations
The review made a great number of recommendations, intended to ‘…increase certainty, speed up processes, reduce duplication and minimise costs’.
These included:
- Strengthening the service culture of consenting bodies.
- Improving co-ordination, collaboration and interaction between consenting bodies and the government departments that oversee them.
- Improving the accessibility of information and guidance.
- Ensuring that once the question of whether a development should happen has been decided, the focus should move to ‘how’ it should happen.
- Simultaneous consideration of issues influencing decisions.
- Wider adoption of best practice.
- Reducing the number of situations in which consents are required.
- Clarifying the boundaries between, and better integrating planning and non-planning consents.
- Combining certain consents, for example; merging conservation area consent with planning permission and combining listed building consent and scheduled monument consent.
The review stopped short of recommending a ‘unified’ consent.
[edit] Impact
In November 2011 the government published the Implementation report on the Penfold Review setting out a programme for the implementation of the review’s recommendations. This included:
- Scrapping unnecessary development consents and simplifying others.
- Reforming the practices of public bodies that grant or advise on development consents.
- Setting a timescale for making decisions on applications.
- Making the application process easier.
In addition, a number of draft improvement plans for key public bodies was published in April 2012 (see the external references at the end of this article), and the Enterprise and Regulatory Reform Bill was drafted, setting out proposals in relation to listed buildings and conservation area consents.
In 2013, the Growth and Infrastructure Act introduced a series of reforms intended to reduce the red tape that the government considers hampers business investment, new infrastructure and job creation. See Growth and Infrastructure Act for more information.
[edit] Related articles on Designing Buildings Wiki
- Conservation area.
- Conservation area consent.
- Enterprise and Regulatory Reform Act 2013.
- Enterprise and Regulatory Reform Act 2013 and listed buildings.
- Growth and Infrastructure Act.
- Killian Pretty Review.
- Listed buildings.
- National Planning Policy Framework.
- Planning permission.
- Planning policy replaced by the NPPF.
- Statutory approvals.
- Statutory authorities.
- Sustainability.
- Taylor Review.
- What approvals are needed before construction begins.
[edit] External references
- Penfold: review of non-planning consents – interim report 2010.
- Penfold: review of non-planning consents – final report 2010.
- Government response to the Penfold Review 2010.
- Implementation report on the Penfold Review 2011.
- Natural England's improvement plan 2012.
- Highway's Agency draft improvement plan 2012.
- RTPI's submission to the Review.
- Written statement by Stephen Hammond, Parliamentary Under Secretary of State for Transport. Proposals to simplify the process of stopping up or diverting a highway will be announced in a consultation response today. 9 January 2013.
- Enterprise and Regulatory Reform Bill.
- The Town and Country Planning (General Development Procedure) Order 1995. Annex A contains full schedule of possible statutory and non-statutory consultees and the circumstance under which they should be consulted.
- Written Ministerial Statement: Implementation of the Penfold Review 16 July 2012.
Featured articles and news
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.
ECA shares advice for those who may be exposed to risks.
How to revolutionise UK housing with MMC
CIC and Supply Chain Sustainability School unveil a plan.
From the UKs largest manufacturer and supplier of lime.
From mud bricks to smart concrete
A brief history from 7000BC to a future on the moon.
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
New Floods Resilience Taskforce
With a wet met office autumn prediction.